Coate Water Care · Site 2

71-bedroom care home

Maximum on-site generation, with a car park turned into a source of income.

  • Solar PV
  • Battery
  • EV charging
Overhead drone view of a care home around a courtyard, with solar panels on most roof slopes
01 / What was installed, and reported

Reported results
for this home.

Annual bill before£45,000
Annual bill after£8,000
Reported annual saving£37,000
Solar panels
257
Battery
50 kWh
EV chargers
3
On site
About 3 weeks

Figures are the annual electricity bills of one client's three homes before and after installation. Results vary by site, usage and energy tariffs.

NoteReported figures, not independently verified.

02 / The roof

Slide across.
See the panels appear.

The same roof, before and after installation. Drag or use the arrow keys.
Design render: aerial view of the care home with the planned panel layout on each roofDesign render
The panel layout, modelled before work started.
03 / The challenge and the works

The challenge.

Generate as much of the home's electricity on site as possible, and turn the car park into a source of income.

The works.

  • Energy audit to find the most cost-effective upgrades
  • 257 solar panels across every suitable roof
  • 50 kWh battery storing surplus solar, and charging on cheaper off-peak rates in winter
  • 3 EV chargers on the Fuuse platform, so the home can charge visitors to use them

NoteThe supplied records plan a 12-month performance review to assess extra battery capacity and renewable heating. Those additions are not part of the documented installed scope.

Next step / Define the brief

Planning a similar site?

Talk to our team