A portfolio plan. Not a copy-and-paste plan.

The discipline is to ask the same good questions at every home, then make room for each building's different answer.

Rooftop solar installation on a large building, representative imageCommon method, site-specific answers
The programme logicScreenSurveyPrioritiseSequence
From estate to action

Four stages of a useful multi-site plan.

A portfolio-level view can help decide where to invest in detailed work without pretending every site has already been designed.

01

01 / Gather

Collect available energy data, site details, plant age, roof information, planned works and known operational concerns. Note gaps rather than filling them with assumptions.

02

02 / Screen

Look for broad opportunities and constraints. A first pass can identify homes worth surveying further, not promise a finished technical or financial outcome.

03

03 / Survey

Check the building itself: electrical systems, plant, roof, access, metering and the practical conditions under which work could happen.

04

04 / Sequence

Prioritise against investment timing, condition of assets, operational disruption and the capacity of group teams to manage concurrent projects.

A productive tension

Standardise the questions. Customise the answers.

Common criteria make sites comparable and decisions easier to explain. But differences in occupation, roof form, infrastructure and maintenance history can change what is practical at each home.

A sensible programme distinguishes between what can be procured or managed consistently and what must be designed locally.

For care home groups
01

Common across the group

Decision criteria, information requirements, reporting format, operational expectations and a shared approach to handover.

02

Specific to each home

Technology sizing, electrical connection, roof and plant constraints, access, residents' routines and installation sequence.

03

Reviewed over time

Update priorities when tariffs, occupation, planned works or the condition of an asset changes. A portfolio plan should remain useful, not become static.

An existing care home and roof seen from above
The finance connection

A shortlist is not yet an investment case.

Early screening helps focus attention, but financial decisions need site-specific assumptions, defined scope and an understanding of the risks or enabling works involved.

Comparing proposals on the same basis makes it easier to see why one home may be ready now while another needs further investigation or planned maintenance first.

Read the finance director's perspective
Two kinds of programme

Where does each home sit?

Existing homes

Retrofit within a living estate.

Build the work around the current building and its occupants. Consider solar, storage, heating, cooling and charging as parts of a wider plan.

Explore retrofit
Future homes

Set the direction before construction.

Coordinate mechanical, electrical and renewable systems early so new developments can be designed as complete, operable homes.

Explore new build
The next conversation

Let's make the first shortlist useful.

Share what you know about the estate, what decisions are coming and where information is missing. We can discuss a practical way to begin.

Discuss your care home
Call EmailSite survey